Stream Diversion for Water Retention,
Page 2 | |
|
First, the protective outer wrapping must be removed from the AquaDam®. Then the pumps are set up and primed. |
|
| All standard AquaDams® require that the open end be elevated up a bank or berm at least as high as the projected height of the AquaDam®, the higher the better. The worker on the right is pulling the AquaDam® up the stream bank. |
|
| Smaug the dragon oversees the setup of the fill tubes and the open end of the AquaDam®. |
|
| Due to the low amount of water flow, it was possible to partially unroll and place the AquaDam® prior to filling. |
|