Lake Sediment Removal in Part 2, Page 2: |
| This shows the U-shaped water-filled cofferdam in front of the concrete overflow dam. After several days of pumping, the lake water was lowered to a depth of 7' in front of the doorway. This picture was taken before dewatering in front of the door. | |
| This is an overhead view of the spillway basin. |
|