Boat Ramp Construction
Rogue River, Grants Pass, OR (2003)
Page 3 of 4
The first AquaDam® goes straight out from the bank. The second AquaDam® started at the end of the first dam, headed down river, and made a 90 degree turn back to the shore. No dirty water left the work site, even though excavation took place to make a level bed for the concrete slabs to be placed on.
Grants Pass, OR
The local inhabitants were curious during the installation and used the first 4' high AquaDam® as a walk platform to shore.
Grants Pass, OR
This is a connection of the two AquaDams®. The main reason this site could not be completely dewatered was the leakage at the connection site of the two AquaDams®. It was not possible to use a connection collar to join the two AquaDams® because of the swift river current.
Grants Pass, OR