The AquaDam® has been completely unrolled, but it is not yet full of water.
Two 3" semi-trash pumps were used for inflation. Installation time so far is
30 minutes. The next AquaDam® to be installed is on the ground next to the pickup.
AquaDam®
AquaDam®
The second AquaDam® is positioned behind the first, and the white
protective wrapper is removed. The collar of the first AquaDam® is
still rolled up on the 4" x 6".