Installation Example
Eagle River
Vail, CO(2000)
Page 6 of 6
Installation of the AquaDams® have been completed. The Eagle River is now diverted and water is flowing through the existing high-water overflow channel. Notice the foot traffic on top of the AquaDam®.   
Vail, CO
Diverted river flow was pushed down to only a 20' wide channel along the north side of the river. The south side of the river (80%) is now an isolated work area. Notice how clean the water is. A large number of boulders had to be removed to achieve a workable seal for dewatering.   
Vail, CO
This shows the end result of the installation of the AquaDams®. Installation time was 14 hours. The excavation process has not yet been started.   
Vail, CO