Dewatering for Bridge Pier Repair Concord River Billerica, MA (2002)
Page 1 of 4
Both of these bridge piers were in need of repair.
A suitable location was chosen to start the AquaDam®.
Large boulders and obstructions had to be moved.
This 5' x 100' AquaDam® was tied back to the trees and had
been installed starting well up the bank, running out into the river,
and making a left turn underneath the bridge.