Stream Diversion Phase Two Antelope Creek Lincoln, CA (2000)
Page 7 of 7
The work site has been dewatered by pumping the trapped water out. Now the
excavation can begin. This called for a huge trench. The excavator had
to dig down 15' to install the sewage pipe.
Seepage underneath the upstream AquaDam® was controlled with a 3"
trash pump. Both AquaDams® were installed within two hours after
filling of the first AquaDam® began.