Stream Diversion:
Antelope Creek, Lincoln, CA

Phase 2, Page 3:

Installation time for the downstream AquaDam® was approximately 15 minutes from the time the pumps started filling. The work site is now ready to be dewatered. The water is pumped over the top of the AquaDam®.   
The work site has been dewatered by pumping the trapped water out. Now the excavation can begin. This called for a huge trench, and the excavator has to dig down 15' to install the sewage pipe.    
Seepage underneath the upstream AquaDam® was controlled with a 3" trash pump. Both AquaDams® were installed within two hours after filling of the first AquaDam® began.   