Rubber Dam Project Russian River, Sonoma, CA (2006)
Page 4 of 17
A view of the project site from up river and the AquaDam® being lowered.
Floating the AquaDam®, pumps, and fill tubes to the bank where the unrolling
will begin. The installation was started an extra 100' up river to avoid the
deep manmade hole, the riprap rocks, and the tree stumps in the immediate area.
A 3' x 100' AquaDam® had already been installed to help control the large AquaDam®
while making the turn in the river.