A 6' high x 100' long AquaDam® was used to block off the river. A 4' x 100'
AquaDam® was placed downstream. Installation time was only six hours.
The river flow was reduced by dam control upstream, which was continued
through three 24" pipes. Sand bags were used between the pipes on both
ends.