Dewatering for Concrete Wall Construction Petaluma, CA (2003)
Page 1 of 1
300 linear feet of 30" high AquaDam® was used to isolate this work area
from the rest of the waterway.
Since the installation site was on quite a steep grade, metal stakes
were placed on either side of the AquaDam® to prevent it from sliding
in the soft mud.
A view of the open end of the first AquaDam®. Notice that the fill
tubes are elevated upon an artificially created earthen berm.