Stream Diversion Tidal Channel for Discharge Pipe Northern Washington (2002)
Page 1 of 2
An 8' x 60' AquaDam® was placed across a stream that was affected by the tide.
Installation took place at low tide. The job site is at the very far reaches
of tidal influence. The work site needed to be dewatered for construction of
a water intake pipe.
The AquaDam® took only one hour to install. The contractor placed Geo-Blocks
behind the AquaDam® to help support it. During high tide this AquaDam® will be
maxed out.
One AquaDam® is placed upstream, one downstream, isolating the work area.