- Boat Ramp Replacement
Little Creek Naval Base, Norfolk, VA (2001)
Page 7 of 21
Pulling a very heavy cable and block to be attached to the excavator.
To keep the workers from sinking knee-deep in the mud, a strip of
filter fabric was put down.
Here she comes! Marines to the rescue.
All of this soupy mud still has to be removed. You can clearly see where
the excavator was trapped.
The AquaDam® and the water of the Atlantic Ocean tower over the workers.
The sailboats are owned by retired Navy personnel. Using an AquaDam®, very
little noise was created. Sheet piling ia very noisy (BANG BANG BANG) and
expensive. Reportedly, the sheet piling "twisted like pretzels" under the
tremendous water pressure.
Since some of the owners live on their boats, special super-quiet insulated
pumps were used to keep noise levels to a minimum.