Boat Ramp Replacement Little Creek Naval Base, Norfolk, VA (2001)
Page 15 of 21
A view of the second section of the walkway.
Starting the third section of the walkway.
Even though the concrete has already been poured, mud still has to be removed
from the toe of the new boat ramp. Boards were put in place to prevent the
excavator's treads from damaging the newly poured concrete.