Concrete pour on the second section of the boat ramp. The mucky area now supports the weight of a fully loaded concrete truck. This demonstrates the superb job done by the MWR crew for the construction of the foundation of the boat ramp.
Norfolk, VA
This is concrete pour #3. The crew is working their way up the boat ramp, 12' at a time.
Norfolk, VA
A close up view of the third pour. Keep in mind that to get to this point, only 4 hours of work can be accomplished per day. The rest of the time, this area is under water. 
Norfolk, VA
Cleaning off the first 3 pours. The area is now ready for pour #4, which will have to be done the following day during low tide. Until then, the work area will be filled with water to relieve pressure on the damaged AquaDam®.
Norfolk, VA