Project overview:
A 16' high AquaDam® was needed to control 10 ½' of water at high tide.
Removal of the old boat ramp was completed after the site was cofferdammed
with steel sheet-pile, which failed before the new boat ramp could be poured.
Further sheet-piling was prohibitively expensive, so the U.S. Navy called AquaDam®.