This AquaDam® was used to create a water-free
work area on a portion of the Rio Grande River. Once
this was accomplished, a cement foundation was poured for a
rubber dam. This was bolted to the top of the foundation.
The excavator had a guide rope tied to it. This determined
the direction the AquaDam® would unroll.
The excavator was used to move and guide the AquaDam®
into place for installation.