While the other unit was filling, this one was rerolled and set back on the trailer.
Once back in Carlotta, it was blown up for air and inspected for damage. Only minor
damage to the first layer of the 4 ply outer tube occurred. The inside tubes had no
holes. No repair was necessary and the unit was rerolled for later use. To install
the other unit and reroll this one took less than 8 hours.