Because of the washout, another AquaDam® had to be installed a week later.
Step 1 is to make sure that the end of the AquaDam® is high enough up the bank so
that it can inflate to 12' in height when completely full. The sides of the unit
have been folded in prior to rolling it up on a beam. Three ropes are being used
to restrain the unit from prematurely unrolling. Notice the water level upstream
compared to the water level downstream.