1,200 linear feet of double-ply 4' high AquaDams® were installed in three
different locations to prevent erosion during wetland restoration. Due to
anticipated high water flows in the adjacent Upper Truckee River, preventing
eroded sediment from entering Lake Tahoe was a priority.
The first AquaDam® at location #1 is laid out and unrolled. Fill hoses are inserted
into the fill tubes and filling begins. The idea is to isolate anticipated high water
flows in the Upper Truckee River from the newly-created adjacent wetlands. Considerable
expense has gone into grading and seeding the reclaimed areas.