You can clearly see the sandy muck and other obstacles that were a hindrance to the effective
operations of the marina. The owner of the marina was not satisfied with the installtion of the AquaDam®s claiming
there was too much leakage under the AquaDam® and decided to call off the project. The discharge
of water over the top of the AquaDam® and into the greater Tahoe Lake was also deemed unacceptable
by the client. Water Structures Unlimited had stated to the client that seepage would occur under the dams
and that dewatering pumps would need to run continually to maintain a dry work area.