It was all the boom truck operator could do to unload and position this large AquaDam®.
Fremont, CA
Ropes were placed under the AquaDam® before it was set down, and were tied back to concrete traffic dividers weighing 7,000 lbs. each. 
Fremont, CA
Making some last minute adjustments in the AquaDam®'s position before it is unrolled down the bank.
Fremont, CA
The fill tubes were folded in as the AquaDam® was being rolled up during assembly. This eliminated the need to manually unroll the AquaDam® prior to filling, but required that we find a way to pull the fill tubes out. We used a pallet puller.