Dewatering for Dam Replacemen
Phase 1
Fairview, OH (2004)
Page 9 of 15
The AquaDam® receiving water, unrolling across the small channel.
Fairview, OH
The AquaDam® is completely across the channel. Pumping time using two 3 inch discharge pumps was approximately 30 minutes.
Fairview, OH
The AquaDam® was kept completely inflated. The water level inside the AquaDam® was way up on the bank. We start it high up the bank to achieve maximum filling potential. This creates a harder, firmer AquaDam® which can hold back a higher water head.
Fairview, OH