Dewatering for Dam Replacemen
Phase 1
Fairview, OH (2004)
Page 4 of 15
The inflation of the AquaDam® was stopped and it was used as a work platform to prep the second AquaDam® for attachment. The fill tubes were inserted up through the connection holes in the attachment collar of the previously installed AquaDam®. Approximately the first 30' had to be unrolled.
Fairview, OH
Both black fill tubes (one on each side) are being pulled up through the hole in the top of the connection collar.
Fairview, OH
Both holes were cut at the end of the first installed AquaDam®. The excess material was pulled into the attachment collar. The attachment collar was pulled out and around the newly attached AquaDam®.
Fairview, OH
 The fill tubes were pulled up and into position. An extra 6' of tubing needed to be pulled out through the attachment hole. Duct tape was removed so that fill hoses could be inserted into the inner tubes of the new AquaDam®.
Fairview, OH