Dewatering for Dam Replacemen
Phase 1
Fairview, OH (2004)
Page 3 of 15
An 8' high x 50' long AquaDam® is installed first. It is started high upon the bank and rolled down into the water. Pumps were set up on the outside of the work area on shore to pump the lake water into the AquaDam®.
Fairview, OH
The AquaDam® is partially unrolled by the water being pumped into it.
Fairview, OH
 The AquaDam® needed to made a bend so it would point to the bank which we need to abut into. Going straight across would require additional length. This AquaDam® had its sides folded in and then rolled up so it took up less space for shipping.
Fairview, OH
 The AquaDam® fully unrolled. The bend in the AquaDam® in clearly visible. This was a tight bend so ropes were needed to hold it in place as the internal water pressure developed.
Fairview, OH