Trapped water drained out underneath the end of the 4' AquaDam® which rested upon some rip-rap on the bank. We did not need to make a water tight seal here with the 4' high AquaDam®. It was being used as a support for the main 8' high AquaDam® in case water levels in the lake rose.
Fairview, OH
This is a far better installation than the original. There are no connections to worry about. Both of these dams were long enough to accomplish the task at hand.
Fairview, OH
This is the fill end of both AquaDams®. You can see how the AquaDams® marry into the bank.
Fairview, OH
Another view looking over the end of the AquaDams® and the fill tubes extending up the bank. Notice the difference in water depths on each side of the AquaDams®.
Fairview, OH