Dewatering for Dam Replacemen
Phase 2
Fairview, OH (2004)
Page 11 of 15
 A crane was needed to lift the AquaDam® up and on to the roadway of the bridge so it could be rerolled properly.
Fairview, OH
This time the contractor wanted to make sure that a rainstorm would not ruin his day. He brought in enough pumping power to lower the water level in the lake. The same crane that removed the AquaDam® was used to lift in two 12 inch electric pumps.
Fairview, OH
The crane lifted the new AquaDam® into place at the top of the bank. It rolled down the bank and pumps were started to inflate the AquaDam®. Internal head pressure unrolled it across the lake. At this point, he AquaDam® has been turned in a crescent shape configuration.
Fairview, OH