Dewatering for Building Construction
University of Pennsylvania
Altoona, PA (2002)
Page 3 of 3
The Aquadam® is still rising higher as water is pumped into it. A barrier has formed, separating the two bodies of water.
45 minutes later (75 minutes from the start of pumping) the AquaDam® has been installed and is inflated several feet above the water of the lake.
Dewatering was to take place the following day. No pictures of dewatering were taken, but the project was a total success.