Pipeline Crossings:

8’, 6’ and 4’ high AquaDams® used to contain sediments during a Williams Transco
natural gas pipeline repair project on the Bogue
Chitto River, McComb, Mississippi.



4’ high AquaDam® used to isolate a pipeline trench from nearby water flow in Eureka, CA.


4’ high AquaDams® were used upstream and downstream of this trench to contain sediments
during a Williams Transco gas pipeline installation in Pine Creek, Williamsport
, PA.


1.5’ high AquaDams® used to
dewater during natural gas pipeline installation, Oakland
, CA.


6’ high AquaDams® used to dewater during pipeline installation in the Pitt River, CA. The river passed through the work area via the pipes.

         
8’ and 6’ high AquaDams® used to isolate the Kettle River from sediment
contamination during pipeline installation near
Grand Forks, BC.

 